Mobility How Many Electric Carts Do You Really Need Per Neighborhood Route?

Electric carts can improve neighborhood cleaning efficiency—but only when they are sized correctly to the route they support. Too few carts create bottlenecks and fatigue. Too many sit idle, tying up capital without improving outcomes.

The goal is not to maximize cart count.
It is to match carts to route design and work patterns.

This article outlines a simple, operational way to determine how many electric carts a neighborhood route actually needs.

Start With the Route, Not the Equipment

Before counting carts, define the route clearly.

A route includes:

  • The geographic area covered in one shift

  • The number of blocks or buildings

  • The location of bin stations

  • The distance between service points

  • The tasks performed (litter pickup, bin servicing, spot washing)

If the route cannot be described clearly, cart sizing will be guesswork.

Step 1: Identify the Number of Active Crews Per Shift

Carts support crews, not areas.

Count:

  • How many cleaning crews are working the route at the same time

  • Whether crews operate independently or in pairs

In most neighborhood operations:

  • One cart supports one active crew

  • Shared carts reduce effectiveness unless tasks are staggered

Rule of thumb:
One cart per active crew on the route.

Step 2: Measure Walking Distance and Carry Load

Carts become necessary when crews:

  • Walk long distances between stops

  • Carry multiple products, liners, or collected waste

  • Service dispersed bin locations

Routes that typically justify carts include:

  • Multi-block corridors

  • Large residential complexes

  • Areas where crews walk more than short, repeated loops

If crews regularly return to a central storage point mid-route, a cart is likely justified.

Step 3: Consider Task Complexity, Not Just Size

A short route with complex tasks may need carts more than a long, simple one.

Carts are especially helpful when routes include:

  • Multiple cleaning products

  • Liner replacement across many bins

  • Spot washing or spill response

  • Waste collection from several points

The more varied the tasks, the more value carts provide by keeping supplies close at hand.

Step 4: Account for Shift Overlap and Downtime

If routes operate in:

  • Multiple shifts

  • Overlapping schedules

  • Shared equipment pools

You may not need a one-to-one ratio across the entire day.

However, avoid planning based on ideal coordination.
Idle time and overlap are normal.

Better to slightly under-share than over-assume efficiency.

Step 5: Build in Minimal Redundancy

Carts require:

  • Charging

  • Occasional maintenance

  • Storage

A route that relies on a single cart with no backup risks disruption.

For multi-crew routes, consider:

  • One additional cart per site or cluster

  • A shared spare for maintenance coverage

This keeps operations stable without excess inventory.

Common Mistakes in Cart Sizing

  • Buying carts before defining routes

  • Assigning one cart to multiple crews simultaneously

  • Assuming carts replace labor

  • Over-equipping small, compact sites

  • Treating carts as a visible upgrade rather than a workflow tool

These mistakes increase cost without improving performance.

Evaluating Cost Against Use

When assessing cart needs, consider:

  • How often carts are in motion during a shift

  • Whether crews complete routes more consistently

  • Reduced walking and staging time

  • Improved adherence to cleaning standards

If a cart sits unused for most of the shift, the issue is likely route design, not cart quality.

The Bottom Line

Most neighborhood routes do not need many electric carts—but they do need the right number.

A practical starting point is:

  • One cart per active crew

  • Plus limited redundancy for maintenance and charging

When carts are matched to routes instead of purchased generically, they support consistent, enforceable cleaning standards without unnecessary cost.

The question is not how many carts look adequate on paper.
It is how many are actually moving with the work.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top